Features of Saiki Power Plant

Saiki Warehouse

Saiki Power Plant utilizes PKS and wood pellets as biomass fuel.
PKS is imported primarily from Indonesia and Malaysia, and the cargo ships carrying it dock at Meshima Wharf.
At Meshima Wharf, there is a vast fuel storage warehouse called “Saeki Warehouse” with a site area of 23,000 square meters, capable of storing PKS unloaded from ships. In 2020, a tent-style roof was installed to further strengthen environmental measures.

Images of facilities at the Saiki Power Plant (Part 1)

Environmental Initiatives

Wastewater from the power plant undergoes treatment to improve water quality (pH and turbidity) before discharge. Exhaust gas from the boilers is released into the atmosphere after passing through bag filters that use filter cloth to remove ash. To control dust, sealed dump trucks are used during fuel transport to prevent the scattering of odors and dust. Furthermore, as part of efforts to utilize waste effectively, combustion ash is recycled through processes such as granulation and solidification.

Images of facilities at the Saiki Power Plant (Part 2)

Power Plant Introduction Video

Saiki Power Plant started commercial operations in November 2016.

Japanese only.

Download Brochure

Japanese only.

Access

Location 337-9 Hiana,
Saiki City, Oita Prefecture 876-1106
Access ■By train: Approx. 3-minute walk from Kaizaki Station (Nippo Main Line); approx. 5-minute drive from Saiki Station
■By car: Approx. 15 minutes from Saiki IC (Higashi-Kyushu Expressway)