November 2023 Power Generation Results (Monthly Power Receipt Volume)

erex Group is pleased to announce the power generation volume (monthly power receipt volume) for November 2023 as follows. 

 

erex Group’s Total Monthly Power Receipt Volume for November *1

5 Power Plants Total 157,401 MWh

 

Name of the Power Plant Tosa Power Plant*2 Saiki Power Plant*3 Buzen Biomass Power Plant*4 Nakagusuku Biomass Power Plant*5 Itoigawa Power Plant*6
Monthly Power Receipt Volume (MWh) 4,166 4,431 47,032 31,322 70,450

*1 Each power volume is rounded down to the nearest whole number.

*2 Tosa Power Plant suspended its operations from Oct 29 to Nov 20 due to periodic repairs.

*3 Saiki Power Plant suspended its operations from Nov 1 to Nov 27 due to periodic repairs. It was also directed to suppress its output once in accordance with the “directive to suppress output based on the priority power supply rule”.

*4 Buzen Biomass Power Plant was directed to suppress its output once in accordance with the “directive to suppress output based on the priority power supply rule”.

*5 Nakagusuku Biomass Power Plant was directed to suppress its output once in accordance with the “directive to suppress output based on the priority power supply rule”.

*6 Itoigawa Power Plant suspended its operations from Sep 30 to Nov 7 due to periodic repairs.

Note) Monthly power receipt volume for Ofunato Power Plant is not disclosed.

 

erex Group operates the largest-level biomass power plants in Japan, fueled by PKS and wood pellets, with a total output of approximately 269 MW (as of the end of November 2023). In addition, erex Group is working to foster renewable energy under the government’s Feed-in-Tariff for Renewable Energy (FIT) program.

erex Group is committed to contributing to the prevention of global warming and the realization of a de-carbonized society by aggressively promoting businesses that utilize renewable energy, centering on biomass business, both in Japan and overseas.

 

Power Generation Results to Date (Unit: MWh)

Name of the Power Plant Tosa Power Plant Saiki Power Plant Buzen Biomass Power Plant Nakagusuku Biomass Power Plant Itoigawa Power Plant 5 Power Plants Total
November 2023 4,166 4,431 47,032 31,322 70,450 157,401
October 2023 12,093 28,939 26,420 32,491 0 99,943
September 2023 12,689 30,513 46,497 30,806 51,608 172,113
August 2023 12,708 31,299 47,881 29,594 52,696 174,178
July 2023 11,559 32,400 48,376 32,380 37,469 162,184
June 2023 12,679 29,427 44,867 31,349 0 118,322