We are currently operating four biomass power plants. The total output will be approximately 350 Megawatt when the two other plants now under contemplation starts its operation.
Tosa (Biomass) Power Plant
Location | Kochi-shi, Kochi-ken |
---|---|
Power generation method | Biomass power generation |
Fuel | PKS(Palm Kernel Shell) |
Power output | 20MW(In Operation) |
Location | Saiki-shi, Oita-ken |
---|---|
Power generation method | Biomass power generation |
Fuel | PKS(Palm Kernel Shell) |
Power output | 50MW(In operation) |
Location | Buzen-shi, Fukuoka-ken |
---|---|
Power generation method | Biomass power generation |
Fuel | PKS(Palm Kernel Shell)、 PKS(Palm Kernel Shell), Wooden pellets |
Power output | 75MW(In operation) |
Location | Oofunato-shi, Iwate-ken |
---|---|
Power generation method | Biomass power generation |
Fuel | Biomass |
Power output | 75MW(In operation) |
Location | Uruma-shi, Okinawa-ken |
---|---|
Power generation method | Biomass power generation |
Fuel | Biomass |
Power output | 49MW( Operation began in July 2020) |
Location | Sakaide-shi, Kagawa-ken |
---|---|
Power generation method | Biomass power generation |
Fuel | Biomass |
Power output | 50MW( Operation planned to begin during fiscal year 2023) |