Power Generation Results(Monthly Power Receipt Volume)for July 2021
erex Group is pleased to announce the power generation volume (monthly power receipt volume) for July 2021 as follows.
erex Group’s Total Monthly Power Receipt Volume for July*1
4 Power Plants Total | 101,010 MWh |
Name of the Power Plant | Tosa Power Plant*2 | Saiki Power Plant*3 | Buzen Biomass Power Plant | Nakagusuku Biomass Power Plant*4 |
Total Monthly Power Receipt Volume (MWh) | 10,944 | 27,471 | 51,052 | 11,543 |
*1 Each power volume is rounded down to the nearest whole number.
*2 Tosa Power Plant suspended its operations from July 1 to July 7 for equipment inspection.
*3 Saiki Power Plant suspended its operations from July 14 to July 19 for equipment inspection.
*4 Nakagusuku Biomass Power Plant started its commercial operations on July 20, 2021.
Note) Monthly power receipt volume for Ofunato Power Plant is not disclosed.
erex Group operates the largest-level biomass power plants in Japan, fueled by PKS and wood pellets, with a total output of approximately 269 MW (as of the end of July 2021). In addition, erex Group is working to foster renewable energy under the government’s Feed-in-Tariff for Renewable Energy (FIT) program.
As a leading company in renewable energy, erex Group is committed to continuing to contribute to the realization of a low-carbon society in Japan by planning a total output of approximately 350 MW with six power plants to realize an even more satisfactory energy supply in the future.
Power Generation Results to Date
Name of the Power Plant | Tosa Power Plant | Saiki Power Plant | Buzen Biomass Power Plant | Nakagusuku Biomass Power Plant | 4 Power Plants Total |
July 2021 | 10,944 | 27,471 | 51,052 | 11,543 | 101,010 |
June 2021 | 12,355 | 31,267 | 48,246 | – | 91,868 |
May 2021 | 13,225 | 19,586 | 37,397 | – | 70,208 |
April 2021 | 5,364 | 28,337 | 22,176 | – | 55,877 |
March 2021 | 6,899 | 28,351 | 49,030 | – | 84,280 |
February 2021 | 12,064 | 29,544 | 45,440 | – | 87,048 |