April 2026 Power Generation Results (Monthly Power Receipt Volume)
erex Group is pleased to announce the power generation volume (monthly power receipt volume) for April 2026 as follows.
erex Group’s Total Monthly Power Receipt Volume for April 2026
| 4 Power Plants Total | 54,730 | MWh |
| Name of the Power Plant | Saiki Power Plant | Buzen Biomass Power Plant | Nakagusuku Biomass Power Plant | Itoigawa Power Plant |
| Monthly Power Receipt Volume (MWh) |
28,566 | 21,812 | 4,352 | 0 |
| Outage Period | – | April 16-May 7 (periodic inspection) |
April 1-26 (periodic inspection) |
April 1-30 (supply-demand adjustments) |
Note) Each power volume is rounded down to the nearest whole number.
Monthly power receipt volume for Ofunato Power Plant is not disclosed.
Tosa Power Plant has been suspending its operations since September 1, 2024.
| Name of the Power Plant | Saiki Power Plant | Buzen Biomass Power Plant | Nakagusuku Biomass Power Plant | Itoigawa Power Plant | 4 Power Plants Total |
| April 2026 | 28,566 | 21,812 | 4,352 | 0 | 54,730 |
| March 2026 | 30,073 | 44,868 | 30,998 | 0 | 105,939 |
| February 2026 | 28,037 | 42,643 | 28,559 | 0 | 99,239 |
| January 2026 | 32,648 | 48,630 | 31,994 | 0 | 113,272 |
| December 2025 | 33,240 | 29,322 | 32,395 | 0 | 94,957 |
| November 2025 | 5,998 | 45,497 | 30,986 | 0 | 82,481 |
Note:
This document is an English translation of the original Japanese language document and has been prepared solely for reference purposes. No warranties or assurances are given regarding the accuracy or completeness of this English translation. In the event of any discrepancy between this English translation and the original Japanese language document, the original Japanese language document shall prevail in all respects.